Scottish building standards sustainability labelling
In Scotland, ministers are responsible for making building standards (equivalent to the building regulations in England) and the associated technical guidance documents. Local authorities act as verifiers administering the building standards system, granting permissions (building warrants) and completion certificates. The main purpose of the standards is to ensure that buildings are safe, efficient and sustainable.
Proposals to introduce sustainability labelling to the Scottish Building Standards for all new buildings were developed by a construction industry working group and made available for public consultation in late 2010. They were induced on 1st of May 2011 by The Building (Scotland) Act.
The labelling system is described in Section 7 of the Scottish Building Standards Technical Handbooks. New buildings that meet the building standards are given a Bronze level label, whilst optional higher levels of sustainability can be given Silver, Gold and Platinum labels.
The labelling system can be used to demonstrate developers’ commitment to sustainability. It can also give planning authorities a mechanism for delivering their obligations under Section 72 of The Climate Change (Scotland) Act 2009 'Development plans: inclusion of greenhouse gas emissions policies'.
Aspects of development considered by the system include:
- Resource use: including energy for space and water heating, CO2 emissions and water use.
- Adaptability: providing dedicated spaces for home working, electric wheelchairs, prams or bicycles.
- Occupant wellbeing: including enhanced noise insulation, increased natural light and improved security provisions.
- Whether buildings incorporate low or zero-carbon generating technology (LZCGT).
The labelling system has been fully developed for domestic buildings, but as yet has only been partially developed for non-domestic buildings.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki.
Featured articles and news
How can digital twins boost profitability within construction?
A brief description of a smart construction dashboard, collecting as-built data, as a s site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.